AX 134 - DUBAI INTERNATIONAL AIRPORT

ETA has been executing Airport Packages from 1997 till now which includes TD-55 – Renovation and Expansion of Phase I, 7 Nos. Hangars for Emirates Hangars one of the world’s biggest Hangar Complex for Maintenance of Aircrafts including A380.

Base on our excellent continued track record with Department of Civil Aviation, ETA has been award MEP works for the most prestigious AX 134 – Dubai International Airport Concourse 3 Expansion Project. The Project value would be around US$.500 Million.

Concourse 3 (C-3) is an extension and continued development of Concourse 1 (C1) and 2 (C-2). It is a fully airside structure and is connected to the 2 major public levels of Terminal 3 (C-3) via an automated people Mover (APM) in addition to Vehicular and Baggage Handling System (BHS) utility tunnels. The APM will also link C-2 and C3 lower levels.

C-3 is partially an underground structure comprising the APM stations (both arriving and departing) and extends above ground under a metal shell to accommodate 20 aircrafts stands out of which 18 are A-380 in addition to 6 hold rooms for remote stands. Similar to C-2, the lower and upper levels of C-3 are connected by means of a special vertical transportation system (sky train) that acts as a focal point feature in a central atrium.

Similar to C-2, the building shell of C-3 continues the characteristic size and arched shape openings along its exterior wall. Its foot pring is 90 m wide and 645 m long. The elliptical form of the skin changes and tapers towards the end, but it remains rectilinear in projection.

Encased in its elliptical shaped form, are two rectangular volumes that hold both 4 and 5 Star Hotel Operations. The First class Lounges are located on two separate levels below the Hotel. The built-up area is approximately 528,000 Sq.Mt. and it’s comprises in addition to the EK lounges and Hotels, the arrival and departure floors including the Duty Free area.

The MEP services include provision for 30,000 TR Air conditioning with associated works, Electrical works cover 50MVA electrical load and Power Distribution, Plumbing, Drainage, Building Management System, Fire fighting & Fire Alarm System, lighting System, Central Emergency Lighting System etc.