EMIRATES TOWER HOTEL

At 309 meters, Emirates Hotel Tower is the Third Tallest Hotel and Twenty Third Tallest Building in the world and is incorporated with the latest state of the art amenities for the businessman.  It is equipped with 400 rooms, including 40 luxury suites and a wide selection of restaurants.  It is the smaller of the Twin towers located on Sheikh Zayed Road.  Together this set of towers is the Second Tallest twin towers in the world.

A five level podium connects the two Towers and contains a 1500 car park, one of the region's largest production kitchens, a laundry, function rooms, the back of house offices and Cafeteria.  A central chiller yard provides chilled water to facilitate the Air Conditioning to the entire complex.  The Sprawling surroundings are provided with lush gardens, landscapes and concealed illumination, spectacular to the eye at night.


PROJECT DETAILS

Client
Lead Consultant
MEP Consultant
Construction Manager
Original Contract Duration
Final Contract Duration
Scope of Works




:
:
:
:
:
:
:




H.H.General Shaikh Mohammed Bin Rashid Al Maktoum
Hyder (Acer Freeman Fox), UK
D.S.S.R., UK
Turner Steiner Int'l S.A. U.S.A.
32 Months
32 Months
Mechanical and Electrical Services including ELV AND Integration, Building Management System, Kitchens, Water Falls and Features, Security Systems, Fire Alarm and Fire Fighting for Hotel Tower, West Podium, Chiller Yard and External Services.
CHILLER YARD MAIN PUMP ROOM

SCOPE OF WORK
  • HVAC System including chiller compound
  • Fire Fighting System
  • Drainage System
  • Domestic Water Supply System
  • Power Distribution System
  • Emergency Power Distribution System
  • Lighting, Lighting Control & Dimming System
  • Fire Alarm / PAVA / Fire Telephone System
  • Central Alarm & Control facility
  • Smoke Extract & Pressurisation System
  • LPG Supply & Leak Detection System
  • FM 200 Fire Detection and Extinguisher System
  • Emergency Lighting System
  • High Performance Music System
  • Structured Cabling & Networking System
  • Building Management System
  • Closed Circuit Television System
  • PABX System
  • Video on Demand System
  • Interactive TV System
  • Staff Paging System
  • Earthing & Lightning Protection System
  • Kitchen Equipment & Services
  • Laundry & Services
  • Water fall and water features

SOME FASCINATING FIGURES OF THE PROJECT
  • 55,000 Light Fixtures
  • 1.8 Million metres of cable
  • 700 tonnes of duct work
  • 27,000 sprinkler heads
  • 60 kms of chilled water piping
  • 150 kms of cold and hot water piping
  • 10 Substations
  • 18 chillers of 8000 TR
  • 15,000 mtrs. Fibre optic backbone cabling
  • 300,000 mtrs. Structured cabling