ABU DHABI NATIONAL EXHIBITION CENTRE

Abu Dhabi National Exhibition Centre, destined to be a major Commercial, Entertainment and leisure hub for the 1.6 Million residents of Abu Dhabi, and for the entire international community.

ETA’s vast experience and capabilities in executing fast-track projects, has led to the successful completion and handing over of a state-of-the-art Abu Dhabi Exhibition Centre within a short span of 8 months.  ADNEC Phase I project is believed to be the fastest constructed building of its type anywhere in the world to host IDEX 2007 Exhibition, one of the world's largest defence exhibitions that took place in Abu Dhabi between 18th to 22nd February 2007.

The Contract was initially awarded for Hall, Concourse, Atrium & Link Building.  However, during the course of Construction, ADNEC felt the requirement for the Grand Stand that was equally important for IDEX event.  ETA stretched the extra mile to accept this additional challenge to execute the Grand Stand, all within the same stipulated duration of 8 months.


PROJECT DETAILS

Client
Lead Consultants
Project Management
Main Contractor

:
:
:
:
Abu Dhabi National Exhibitions Company (ADNEC)
M/s. Robert Mathew, Johnson – Marshall (RMJM)
M/s. MACE International
M/s. Al Habtoor Engineering Works Co. LLC (HEE)
EXHIBITION HALL

ATRIUM CONCOURSE

EXHIBITION CENTRE COMPRISES OF:
  • 94,000 Sq.m Gross Floor Area
  • 28,000 Sq.m Exhibition Floor space
  • 16 Nos. Mezzanine level Meeting rooms
  • Ultra modern Business Centres
  • 2,000 Sq.mtrs Food Court
  • 12,000 Sq.mtrs Office Space
  • Redesign & Refurbishment of Grand Stand
OTHER SPECIALITIES
  • Grand Public Concourse
  • Loading Docks
  • Grand Kitchen
  • VIP Majlis & Dinning
  • Large Atrium
CONCOURSE EXTERNAL FIRE PUMPS



The scope involved Detailed Engineering, Supply, Installation, Testing & Commissioning of HVAC, Electrical, Plumbing, Drainage, Fire Fighting and other Specialist systems.

HVAC

  • 1,375,000 Sq.ft of GI & Fire Rated Ducting
  • 113 Nos. AHUs & 602 Nos. FCUs
  • 26 KM Chilled water piping
  • 1 Km u/g Buried Pre-insulated pipe works
  • 8 Nos. Heat Exchangers
  • 113 Nos. Air Handling Units
  • 76 Nos. Indoor Air Quality Equipments (IAQ)
  • 122 Nos. Extract Fans
  • 350,000 sq.ft Cladding works
  • 4 Nos. Close Control Units
ELECTRICAL & SPECIALIST SYSTEMS
  • 21 Cubicles MV Panels
  • 13 Nos. 1500 kVA Transformers
  • 2 Nos. 800 kVA Generators
  • 102 Nos. LV Panel Boards & Lighting Control Panel
  • 8 KM Cold Cathode Lighting
  • 4,200 Nos. Fire Alarm & PAVA Peripherals
  • 113,000 Nos. (85 types) Lighting Fixtures
  • 129 Nos. Access Controlled Doors
  • 4,500 IT / Data Points
  • 7,000 BMS Points
PLUMBING, DRAINAGE & FIRE FIGHTING SERVICES
  • 54 KM Fire Fighting Network
  • 9,000 Nos. Sprinklers
  • 17 KM Water Supply Network
  • 29 KM Drainage Pipe Works
  • 42 Nos. Public Toilets
IAQ EQUIPMENT MAIN SERVER ROOM

LV ROOM MECHANICAL PLANT ROOM

SECURITY CONTROL ROOM TRANSFORMER ROOM