MARINA MALL

Marina Mall is a unique family entertainment and shopping complex situated in the backwaters of Abu Dhabi.  It has over 100,000 Sq. Mtrs. of shopping area with more than 160 shops ranging from Fashion Ware, Home Appliances & Furniture, a mega Super-market, Jewellery etc.  The mall has a sprawling food court serving Oriental and continental cuisine;  Foton World – Entertainment complex for children;  Cinestar – 9 Cinema complex and an assortment of Cafes.  There is ample car parking space available.  It has the biggest tent structure in the Gulf region, which is illuminated from inside and outside with vivid colors to give a spectacular view in the night against the backdrop of azure sea.

Marina Mall is an intelligent complex having state of the art MEP system such as Building Management System, CCTV, Fire Alarm, Public Address etc.  The entire mall is air-conditioned with battery of chillers having a total installed capacity of over 4800 Tons of Refrigeration .

 

 
PROJECT DETAILS
 

Project

Client
Project Manager
Principal Consultant
Main Contractor

:

:
:
:
:
Family Entertainment, Commercial and shopping complex
“Marina Mall”, Abu Dhabi
M/s National Investment Corporation, Abu Dhabi
GIBB Ltd.
Archetectutral & Consulting Group, Abu Dhabi
Al Habtoor – Murray & Roberts JV
SCOPE OF MEP WORK (DESIGN & BUILD)
 
  • Over 4800 Tons of Refrigeration System (15 x 312 TR + 1x 150 TR Air-cooled Chilers)
  • Smoke Ventilation and Management System.
  • Sprinkler and Fire Fighting System.
  • State of the art Building Management System.
  • Plumbing and drainage System in HDPE and Polypropylene materials.
  • 2 Nos. standby Power System (DG Sets of 1000 KVA each).
  • Intelligent Fire Alarm System and FP 200 System
  • Programmable Lighting Control System.
  • Power Distribution and Lighting System.
  • Public Address System
  • Audio / Video System with Plasma Screen TV sets.
  • Colsed Circuit Television System.
  • Cable TV System.
  • Traffic Barrier System.
CHILLER'S BATTERY   PIPE HEADER/CONNECTIONS TO CHILLED WATER PUMPS

 

 
L V PANEL IN SUB-STATION   H T PANEL IN SUB-STATION