SHEIKH KHALIFA ENERGY COMPLEX

Shaikh Khalifa Energy Comple on Corniche Road of Abu Dhabi, houses the Head Quarters of ADNOC Group Companies.   The complex comprises 4 towers, 2 of which are 27 storeyed and other 2 towers are 20 storeyed each.

The Mechanical floors are situated at 27th & 20th floor respectively and there are 8 levels of car parking which can accommodate approximately 1470 Cars.

ETA has provided the state-of-the-art Electromechanical Services for the entire Complex.  In addition to that 7 Nos. Chillers were relocated from Level II to Level VI of the Car Park.  This work was carried out while the system was completely in operation without any shut down of Air Conditioning.


PROJECT DETAILS

Project
Client
Consultants
Main Contractor
Project Managers

:
:
:
:
:
Shaikh Khalifa Energy Complex
Abu Dhabi National Oil Company (ADNOC)
W.S. Atkins
Al Habtoor & Murray & Roberts JV (HMR)
DMJM International

HVAC SYSTEM PER TOWER
  • 5 x 30 TR Air Cooled Screw Chillers
  • 5 Nos. Variable Speed Primary CHW pumps
  • 1 No. Automatic Chemical Dosing System
  • 25 Nos. re-circulating AHUs driven by VFDs
  • 3 Nos. FAHUs with heat recovery wheels
  • Close control units for precision control
  • 28 Nos. Variable Air Volume Boxes per office floor
ELECTRICAL SYSTEM PER TOWER
  • 4 x 150 kVA transformers
  • 1 x 1500 kVA Diesel Generator set
  • 2 Nos Automatic Transfer Switches
  • 2 x 60 kVA UPS
  • 2 Nos Main LV Panels
  • Bus Bar Riser System

LOW CURRENT SYSTEM
  • BMS for HVAC controls
  • Chiller Plant Manager for automatic chiller sequencing
  • Lighting Control System
  • Central Battery System for emergency lights
  • CCTV / Security / Access Control System.
  • Fire Alarm System.
  • Very Early Smoke Detection system.
  • Argonite Gas Fire Suppression system
  • Leak Detection System
  • Disabled Toilet Alarm System
POTABLE WATER & FIRE FIGHTING SYSTEM
  • 4 Nos. Potable Water Pumps
  • 1 No. Jockey Pump
  • 5 Nos. Fire fighting pumps