M I R D I F F  M A L L

mirdiff mall dubai

ETA M&E has been awarded the electromechanical works for Mirdiff City Centre, by M/s. Majid Al Futtaim Group, the Developers of Shopping Centres in the Middle East and North Africa. The total built up area this mall would be around 550,000 square meters on Mirdiff area located on Emirates Road.

Project                          :         Mirdif City Centre

Client                            :         M/s. Majid Al Futtaim Investment LLC

Project Management    :         M/s. Mace International

Main Contractor            :         M/s. Al Jaber Grinaker LTA Engineering & Contg. (ALEC)

mirdiff

The mall is a hub of the greater community with extensive provisions of facilities such as dedicated community areas, medical clinics, spa, personal grooming facilities and a fitness centre.

 Mirdif City Centre has 430 stores, with provision for 8 anchor stores including Carrefour in two-level mall, Magic Planet, 14-screen multiplex cinemas, 2 food courts with 60 multi-cuisine restaurants, cafes and 7,000 plus Car Park.

palmcourt

Palm Court

foodcourt

Food Court

HVAC


The electromechanical works include more than 18,000TR of Air Conditioning, Electric Sub Stations catering to 112 MW of connected load, Complete LV works and ELV systems including state of the art BMS, Fire Alarm, Structured Cabling, Video Intercom, Security access etc. and Water Supply, Sanitary & Fire Fighting works covering high end quality requirements.

Water Cooled Centrifugal Chillers
Water cooled Centrifugal Chillers

cooling tower
COOLING TOWERS

  • 6 Nos. X 2500 TR each Centrifugal Water Cooled Chillers
  • 6 Nos. Cooling Towers
  • 6 Nos. Primary CHW Pump
  • 27 Nos. Secondary CHW Pump
  • 6 Nos. Condenser Water pumps
  • 135 Nos. AHUs
  • 1345 Nos. FCUs
  • 179 Nos. Kitchen/Smoke/General Extract Fans
  • 516 Nos. Smoke Ventilators
  • 7 Nos. Ecology Units
  • 88 Nos. Air curtains
  • 11 Nos. De-aretors
  • Make up water pump for cooling towers
  • Chemical Dosing System
ahus
Air Handling Units


Cooling Tower Make up Water Pump

PLUMBING AND FIRE FIGHTING SYSTEM
  • 313 Nos. Fire Hose Cabinets
  • 23 Nos. FM200 Fire Suppression System
  • 18 Nos. Submersible Sump Pump
  • 31 Nos. Sprinkler Fire Hydrant System
  • LPG System
  • GRP Tank
  • Centrifugal Fire Pumps
  • Jockey Pumps
  • Transfer Pumps
  • Heat Exchangers
Booster pums
Booster Pump

Condenser Water Pumpset

Fire Fighting Pumps


Chilled water pumpset

Automatic tube brushing system


Dearetors


LV ROOM
ELV AND BMS SYSTEM
  • 844 Nos. CCTV Cameras
  • Building Management System
  • Security System
  • Public Address & Voice Evacuation System
  • Intercom System
  • Access Control System
ELECTRICAL
  • 9 Nos. L.V Substations
  • 44 Nos. Electrical Rooms
  • HV Room Feeding 11kV Chillers
  • 17 Nos. UPS Panels
  • 21 Central Battery Panels
  • Lighting Control System

4 11 KV HV SS WITH FM 200 FIRE SUPPRESSION SYSTEM

11 KV HV SS WITH FM 200 FIRE SUPPRESSION SYSTEM