KHALIDIYA PALACE ROTANA HOTEL & RESIDENCES, ABUDHABI

Khalidiya Palace

The Khalidiya Palace Rotana Hotel & Residences is a prestigious project of the Pvt. Dept of H.H. Sheikh Mohammed Bin Khalid Al Nahyan, in Abu Dhabi city cater to the needs of tourism and hospitality sectors. The project has been designed to provide super-luxurious residential accommodation through one Five Star Hotel Tower and three Residential Towers.

The hotel tower includes a total 443 luxurious rooms, suits and serviced apartments. It will be enabled with a business centre with conference and meeting facilities, accommodating six fully equipped and flexible meeting rooms fitted latest audio visual equipments

Client :  Pvt. Dept. of H.E. Sheikh Mohammed Bin Khalid Al Nahyan
Project Manager :  M/s E.C. Harris International Limited
Consultant :  M/s Khatib & Alami Consolidated Engineering Co.
Main Contractor :  M/s Nurol General Contracting LLC
MEP Contractor :  M/s Emirates Technical Associates (ETA), Abu Dhabi
Commencement Date :  August 2006
Completion Date:  September 2010

ETA- M&E has provided Mechanical & Electrical services for the entire complex including Leisure facilities such as white sanded beach, swimming pools, state of the art fitness centre andspa and extensive water sport activities, along with all-day restaurants and ballroom

CHILLERS BAY

Chillers Bay

CHILLED WATER PUMPS 

CHILLED WATER PUMPS

Air Conditioning Work
• 6,500 TR Air Cooled Screw Chillers
• 41 Nos. FAHUs/AHUs
• 2177 Nos. Fan Coil Units
• 43 Nos. Chilled Water Pumps
• 40 KM Chilled Water Piping
• 125,000 Sq. Mtrs. of Ducting
• Fire-rated ducts for sensitive areas
• 77 Nos. Exhaust Fans
• 17000 Nos. BMS Points

Electrical & ELV System

• 22 Nos 11 kV/400 V Dry Type     Transformer
• 3000 Meters of Busbar Installations
• 4 Nos. standby Generator (15,364 kw)
• 3 Kilomters of HV Cables
• 5 Nos. 11 kV Switchgear
• 19 Nos. MDB
• 149 Nos. SMDB and 1080 Nos. DB
• 11 Kilometers of XLPE Cables
• 42000 Nos. Switches & Sockets
• 4500 Nos. Fire Detecting Device
• 1165 Nos. Voice Evacuation Point
• 49,000 Nos Light Fittings

AHU

• 48 Nos. Central Battery Panel
• 46 Nos. Lighting Control Panel
• 11 Nos. Fire Alarm Panel



            Plumbing & Fire Fighting System

• 48 Kilometer Water Supply Pipes
• 25 Kilometer Hot Water Supply Pipes
• 31 Kilometers Fire Fighting Pipes
• 1117 Nos. Water Heaters
• 25 Sets Water Pumps
• 3 Nos. Fire Pumps
• 7000 Nos. Sprinklers

Specialised Equipments

• 3 Nos. Steam Boilers
• 6 Nos. Calorifiers
• 2 Nos Water Filtration System
• 2 Nos. Water Softner System
• Swimming Pool & Water Fountain
   system
• Centralized LPG System



STEAM BOILERS
sb
CALORIFIERS                                                             FIRE PUMPS
cf        firepump
SWIMMING POOL EQUIPMENT LVPANELS
SP       LVP